ITAC Assessment: TN0277
ITAC logo
ITAC Assessment: TN0277
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product HARD/JELLY CANDY, CHOCOL
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $5
M
to 10
M
# of Employees 125
Plant Area
n/a
Annual Production 7,000,000
lb
Production Hrs. Annual 3,500
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,503 1,517,878
kWh
Natural Gas $84,433 17,577
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,020 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,175

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $5,434 $15,840 - $5,434
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $3,442 $150 - $3,442
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $2,251 $500 - $2,251
-
MMBtu
04 2.2135: Repair and eliminate steam leaks $2,016 $125 - $2,016
-
MMBtu
05 2.7243: Improve air circulation with destratification fans / other methods $581 $2,500 - $581
-
MMBtu
06 2.2122: Install / repair insulation on condensate lines $264 $111 - $264
-
MMBtu
07 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $826 $1,700 $826
14,654
kWh
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $396 - $396
7,034
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $661 $440 $661
11,723
kWh
-
10 2.4221: Install compressor air intakes in coolest locations $149 $220 $149
2,638
kWh
-
TOTAL RECOMMENDED $16,020 $21,586 $2,032
36,049
kWh
$13,988
-
MMBtu
TOTAL IMPLEMENTED $15,175 $18,975 $2,032
36,049
kWh
$13,143
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs