| Assessment Year | 1986 |
|---|---|
| Principal Product | HARD/JELLY CANDY, CHOCOL |
| NAICS |
n/a
|
| SIC | 2064: Candy and Other Confectionery Products |
| Sales Range | $5 M to 10M |
| # of Employees | 125 |
| Plant Area |
n/a
|
| Annual Production | 7,000,000
lb
|
| Production Hrs. Annual | 3,500
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $85,503 | 1,517,878 |
kWh
|
$0.056 |
| Natural Gas | $84,433 | 17,577 |
MMBtu
|
$4.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $16,020 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,175 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $5,434 | $15,840 | - |
$5,434
-
MMBtu
|
|
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,442 | $150 | - |
$3,442
-
MMBtu
|
|
| 03 | 2.2136: Install / repair insulation on steam lines | $2,251 | $500 | - |
$2,251
-
MMBtu
|
|
| 04 | 2.2135: Repair and eliminate steam leaks | $2,016 | $125 | - |
$2,016
-
MMBtu
|
|
| 05 | 2.7243: Improve air circulation with destratification fans / other methods | $581 | $2,500 | - |
$581
-
MMBtu
|
|
| 06 | 2.2122: Install / repair insulation on condensate lines | $264 | $111 | - |
$264
-
MMBtu
|
|
| 07 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $826 | $1,700 |
$826
14,654
kWh
|
- | |
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $396 | - |
$396
7,034
kWh
|
- | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $661 | $440 |
$661
11,723
kWh
|
- | |
| 10 | 2.4221: Install compressor air intakes in coolest locations | $149 | $220 |
$149
2,638
kWh
|
- | |
| TOTAL RECOMMENDED | $16,020 | $21,586 |
$2,032
36,049
kWh
|
$13,988
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $15,175 | $18,975 |
$2,032
36,049
kWh
|
$13,143
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs