| Assessment Year | 1986 |
|---|---|
| Principal Product | SNACK CAKES |
| NAICS |
n/a
|
| SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
| Sales Range | $10 M to 50M |
| # of Employees | 160 |
| Plant Area |
n/a
|
| Annual Production | 14,000,000
lb
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $90,735 | 1,710,141 |
kWh
|
$0.053 |
| Natural Gas | $144,232 | 28,186 |
MMBtu
|
$5.12 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,846 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,585 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $4,831 | $95 |
$4,831
91,149
kWh
|
- | |
| 02 | 3.4154: Eliminate leaks in water lines and valves | $1,382 | - | - |
$1,382
-
MMBtu
|
|
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $1,515 | $5,000 | - |
$1,515
-
MMBtu
|
|
| 04 | 2.2511: Insulate bare equipment | $566 | $1,851 | - |
$566
-
MMBtu
|
|
| 05 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $746 | $3,600 |
$746
14,068
kWh
|
- | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $373 | $500 |
$373
7,034
kWh
|
- | |
| 07 | 2.7441: Replace broken windows and/or window sash | $122 | $600 | - |
$122
-
MMBtu
|
|
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $311 | $45 |
$311
5,862
kWh
|
- | |
| TOTAL RECOMMENDED | $9,846 | $11,691 |
$6,261
118,113
kWh
|
$3,585
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,585 | $3,091 |
$5,515
104,045
kWh
|
$2,070
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs