ITAC Assessment: TN0276
ITAC logo
ITAC Assessment: TN0276
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product SNACK CAKES
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 14,000,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,735 1,710,141
kWh
Natural Gas $144,232 28,186
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,846 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,585

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $4,831 $95 $4,831
91,149
kWh
-
02 3.4154: Eliminate leaks in water lines and valves $1,382 - - $1,382
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $1,515 $5,000 - $1,515
-
MMBtu
04 2.2511: Insulate bare equipment $566 $1,851 - $566
-
MMBtu
05 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $746 $3,600 $746
14,068
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $373 $500 $373
7,034
kWh
-
07 2.7441: Replace broken windows and/or window sash $122 $600 - $122
-
MMBtu
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $311 $45 $311
5,862
kWh
-
TOTAL RECOMMENDED $9,846 $11,691 $6,261
118,113
kWh
$3,585
-
MMBtu
TOTAL IMPLEMENTED $7,585 $3,091 $5,515
104,045
kWh
$2,070
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs