ITAC Assessment: TN0273
ITAC logo
ITAC Assessment: TN0273
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product TEXTILE LOOM FIXTURES
NAICS
n/a
SIC 3552: Textile Machinery
Sales Range $5
M
to 10
M
# of Employees 250
Plant Area
n/a
Annual Production 8,600,000
lb
Production Hrs. Annual 2,750
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $540,601 11,085,874
kWh
Natural Gas $345,387 62,814
MMBtu
Coal $353,340 65,052
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $132,770 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $93,836

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Coal Savings
01 2.7261: Install timers and/or thermostats $61,908 $4,200 - $61,908
-
MMBtu
-
02 2.2414: Use waste heat from hot flue gases to preheat $35,336 $79,000 - - $35,336
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $19,635 $2,800 - $19,635
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,293 $1,680 $12,293
250,879
kWh
- -
05 2.2447: Heat water with exhaust heat $1,562 $7,200 - $1,562
-
MMBtu
-
06 2.2163: Use minimum steam operating pressure $1,249 - - $1,249
-
MMBtu
-
07 2.2122: Install / repair insulation on condensate lines $787 $87 - $787
-
MMBtu
-
TOTAL RECOMMENDED $132,770 $94,967 $12,293
250,879
kWh
$85,141
-
MMBtu
$35,336
-
MMBtu
TOTAL IMPLEMENTED $93,836 $8,680 $12,293
250,879
kWh
$81,543
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Coal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs