| Assessment Year | 1986 |
|---|---|
| Principal Product | TEXTILE LOOM FIXTURES |
| NAICS |
n/a
|
| SIC | 3552: Textile Machinery |
| Sales Range | $5 M to 10M |
| # of Employees | 250 |
| Plant Area |
n/a
|
| Annual Production | 8,600,000
lb
|
| Production Hrs. Annual | 2,750
hrs
|
| Location (State) | South Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $540,601 | 11,085,874 |
kWh
|
$0.049 |
| Natural Gas | $345,387 | 62,814 |
MMBtu
|
$5.50 |
| Coal | $353,340 | 65,052 |
MMBtu
|
$5.43 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $132,770 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $93,836 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Coal Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $61,908 | $4,200 | - |
$61,908
-
MMBtu
|
- | |
| 02 | 2.2414: Use waste heat from hot flue gases to preheat | $35,336 | $79,000 | - | - |
$35,336
-
MMBtu
|
|
| 03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $19,635 | $2,800 | - |
$19,635
-
MMBtu
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,293 | $1,680 |
$12,293
250,879
kWh
|
- | - | |
| 05 | 2.2447: Heat water with exhaust heat | $1,562 | $7,200 | - |
$1,562
-
MMBtu
|
- | |
| 06 | 2.2163: Use minimum steam operating pressure | $1,249 | - | - |
$1,249
-
MMBtu
|
- | |
| 07 | 2.2122: Install / repair insulation on condensate lines | $787 | $87 | - |
$787
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $132,770 | $94,967 |
$12,293
250,879
kWh
|
$85,141
-
MMBtu
|
$35,336
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $93,836 | $8,680 |
$12,293
250,879
kWh
|
$81,543
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Coal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs