ITAC Assessment: TN0270
ITAC logo
ITAC Assessment: TN0270
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product ATHLETIC UNIFORMS
NAICS
n/a
SIC 2329: Men's and Boys' Clothing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 800,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,718 662,954
kWh
Natural Gas $47,797 10,486
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,574 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,421

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7492: Use proper thickness of insulation on building envelope $5,709 $15,000 - $5,709
-
MMBtu
02 2.2122: Install / repair insulation on condensate lines $2,686 $1,200 - $2,686
-
MMBtu
03 2.2163: Use minimum steam operating pressure $271 - - $271
-
MMBtu
04 2.6232: Install set-back timers $680 - $680
11,723
kWh
-
05 2.6218: Turn off equipment when not in use $663 $150 $663
11,430
kWh
-
06 2.2122: Install / repair insulation on condensate lines $153 $50 - $153
-
MMBtu
07 2.6232: Install set-back timers $343 - $343
5,862
kWh
-
08 2.2511: Insulate bare equipment $69 $125 - $69
-
MMBtu
TOTAL RECOMMENDED $10,574 $16,525 $1,686
29,015
kWh
$8,888
-
MMBtu
TOTAL IMPLEMENTED $10,421 $16,475 $1,686
29,015
kWh
$8,735
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs