ITAC Assessment: TN0269
ITAC logo
ITAC Assessment: TN0269
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product WOMEN'S HANDBAGS
NAICS
n/a
SIC 3171: Women's Handbags and Purses
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area
n/a
Annual Production 750,000
pieces
Production Hrs. Annual 2,470
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,857 466,882
kWh
Natural Gas $21,650 3,977
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,325 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,325

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $2,310 $1,500 $(-40.0)
(-586)
kWh
$2,350
-
MMBtu
02 2.7243: Improve air circulation with destratification fans / other methods $1,414 $1,800 - $1,414
-
MMBtu
03 2.6232: Install set-back timers $2,001 - $2,001
29,308
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $680 - $680
9,965
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $920 $288 $920
13,482
kWh
-
TOTAL RECOMMENDED $7,325 $3,588 $3,561
52,169
kWh
$3,764
-
MMBtu
TOTAL IMPLEMENTED $7,325 $3,588 $3,561
52,169
kWh
$3,764
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs