ITAC Assessment: TN0268
ITAC logo
ITAC Assessment: TN0268
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product ADULT & CHILDREN CLOTHES
NAICS
n/a
SIC 2325: Men's and Boys' Separate Trousers and Slacks
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area
n/a
Annual Production 2,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,454 720,985
kWh
LPG $117,232 21,695
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,398 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,269

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.2515: Use optimum thickness insulation $2,008 $2,000 $2,008
81,770
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $884 - - $1,184
-
MMBtu
$(-300.0)
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,482 $250 $3,482
58,030
kWh
- -
04 2.2122: Install / repair insulation on condensate lines $895 $250 - $895
-
MMBtu
-
05 2.2122: Install / repair insulation on condensate lines $529 $200 - $529
-
MMBtu
-
06 2.6232: Install set-back timers $1,600 - $1,600
26,671
kWh
- -
TOTAL RECOMMENDED $9,398 $2,700 $7,090
166,471
kWh
$2,608
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED $7,269 $2,500 $5,490
139,800
kWh
$2,079
-
MMBtu
$(-300.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs