ITAC Assessment: TN0265
ITAC logo
ITAC Assessment: TN0265
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product CHEESE
NAICS
n/a
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $10
M
to 50
M
# of Employees 34
Plant Area
n/a
Annual Production 10,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,810 1,662,954
kWh
Natural Gas $145,402 30,629
MMBtu
Fuel Oil #2 $3,170 462
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,811 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,811

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.2136: Install / repair insulation on steam lines $7,706 $2,000 - $7,706
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $8,904 $320 - $8,712
-
MMBtu
$192
-
MMBtu
03 2.2163: Use minimum steam operating pressure $3,947 - - $3,858
-
MMBtu
$89
-
MMBtu
04 2.2135: Repair and eliminate steam leaks $1,386 $75 - $1,356
-
MMBtu
$30
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,474 $7,430 $4,474
93,200
kWh
- -
06 2.2122: Install / repair insulation on condensate lines $896 $115 - $876
-
MMBtu
$20
-
MMBtu
07 2.6232: Install set-back timers $498 - $498
10,258
kWh
- -
TOTAL RECOMMENDED $27,811 $9,940 $4,972
103,458
kWh
$22,508
-
MMBtu
$331
-
MMBtu
TOTAL IMPLEMENTED $27,811 $9,940 $4,972
103,458
kWh
$22,508
-
MMBtu
$331
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs