| Assessment Year | 1985 |
|---|---|
| Principal Product | CHEESE |
| NAICS |
n/a
|
| SIC | 2022: Natural, Processed, and Imitation Cheese |
| Sales Range | $10 M to 50M |
| # of Employees | 34 |
| Plant Area |
n/a
|
| Annual Production | 10,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $80,810 | 1,662,954 |
kWh
|
$0.049 |
| Natural Gas | $145,402 | 30,629 |
MMBtu
|
$4.75 |
| Fuel Oil #2 | $3,170 | 462 |
MMBtu
|
$6.86 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $27,811 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $27,811 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2136: Install / repair insulation on steam lines | $7,706 | $2,000 | - |
$7,706
-
MMBtu
|
- | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,904 | $320 | - |
$8,712
-
MMBtu
|
$192
-
MMBtu
|
|
| 03 | 2.2163: Use minimum steam operating pressure | $3,947 | - | - |
$3,858
-
MMBtu
|
$89
-
MMBtu
|
|
| 04 | 2.2135: Repair and eliminate steam leaks | $1,386 | $75 | - |
$1,356
-
MMBtu
|
$30
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,474 | $7,430 |
$4,474
93,200
kWh
|
- | - | |
| 06 | 2.2122: Install / repair insulation on condensate lines | $896 | $115 | - |
$876
-
MMBtu
|
$20
-
MMBtu
|
|
| 07 | 2.6232: Install set-back timers | $498 | - |
$498
10,258
kWh
|
- | - | |
| TOTAL RECOMMENDED | $27,811 | $9,940 |
$4,972
103,458
kWh
|
$22,508
-
MMBtu
|
$331
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $27,811 | $9,940 |
$4,972
103,458
kWh
|
$22,508
-
MMBtu
|
$331
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs