ITAC Assessment: TN0257
ITAC logo
ITAC Assessment: TN0257
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product VALVES FOR CHEMICAL PROC
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 4,704
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $398,806 8,211,899
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,202 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,048

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7234: Use heat pump for space conditioning $17,233 $429,000 $17,233
351,700
kWh
02 2.7243: Improve air circulation with destratification fans / other methods $8,904 $37,200 $8,904
181,712
kWh
03 2.2514: Cover open tanks $3,102 $200 $3,102
63,306
kWh
04 2.7111: Reduce illumination to minimum necessary levels $2,915 - $2,915
59,496
kWh
05 2.4221: Install compressor air intakes in coolest locations $1,048 $450 $1,048
21,395
kWh
TOTAL RECOMMENDED $33,202 $466,850 $33,202
677,609
kWh
TOTAL IMPLEMENTED $1,048 $450 $1,048
21,395
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs