Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product MEN'S & WOMEN'S CLOTHES
NAICS
n/a
SIC 2311: Men's and Boys' Suits, Coats, and Overcoats
Sales Range $1
M
to 5
M
# of Employees 150
Plant Area
n/a
Annual Production 1,000,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,961 890,387
kWh
Natural Gas $11,336 1,895
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,491 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,628 $375 $1,628
26,377
kWh
-
02 2.6232: Install set-back timers $380 - $380
6,155
kWh
-
03 2.2136: Install / repair insulation on steam lines $102 $119 - $102
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $327 $420 $327
5,275
kWh
-
05 2.2122: Install / repair insulation on condensate lines $54 $40 - $54
-
MMBtu
TOTAL RECOMMENDED $2,491 $954 $2,335
37,807
kWh
$156
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs