Assessment Year | 1984 |
---|---|
Principal Product | MEN'S DRESS SLACKS |
NAICS |
n/a
|
SIC | 2325: Men's and Boys' Separate Trousers and Slacks |
Sales Range | $10 M to 50M |
# of Employees | 556 |
Plant Area |
n/a
|
Annual Production | 2,700,000
pieces
|
Production Hrs. Annual | 1,955
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $222,762 | 4,951,934 |
kWh
|
$0.045 |
Natural Gas | $35,156 | 7,028 |
MMBtu
|
$5.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,079 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,959 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $7,856 | - |
$7,856
174,678
kWh
|
- | - | |
02 | 2.2136: Install / repair insulation on steam lines | $1,292 | $794 |
$492
10,844
kWh
|
$800
-
MMBtu
|
- | |
03 | 2.2135: Repair and eliminate steam leaks | $956 | $140 |
$364
8,206
kWh
|
$592
-
MMBtu
|
- | |
04 | 2.7442: Keep doors and windows shut when not on use | $1,287 | - |
$1,287
28,722
kWh
|
- | - | |
05 | 2.2163: Use minimum steam operating pressure | $257 | - |
$120
2,638
kWh
|
$137
-
MMBtu
|
- | |
06 | 2.2511: Insulate bare equipment | $510 | $253 |
$194
4,396
kWh
|
$316
-
MMBtu
|
- | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $707 | - |
$707
15,826
kWh
|
- | - | |
08 | 3.4154: Eliminate leaks in water lines and valves | $1,795 | $480 |
$481
10,844
kWh
|
- | $1,314 | |
09 | 2.7444: Close holes and openings in building such as broken windows | $165 | - |
$36
879
kWh
|
$129
-
MMBtu
|
- | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $207 | $32 |
$207
4,689
kWh
|
- | - | |
11 | 2.2511: Insulate bare equipment | $47 | $35 | - |
$47
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $15,079 | $1,734 |
$11,744
261,722
kWh
|
$2,021
-
MMBtu
|
$1,314 | ||
TOTAL IMPLEMENTED | $5,959 | $1,446 |
$2,987
66,822
kWh
|
$1,658
-
MMBtu
|
$1,314 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs