ITAC Assessment: TN0235
ITAC logo
ITAC Assessment: TN0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product LEATHER TANNING
NAICS
n/a
SIC 3111: Leather Tanning and Finishing
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area
n/a
Annual Production 500,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $214,835 4,395,956
kWh
Natural Gas $869,276 163,889
MMBtu
LPG $11,762 1,191
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $225,678 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $221,146

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $155,565 $49,200 $(-18,158.0)
(-371,630)
kWh
$173,723
-
MMBtu
-
02 2.2135: Repair and eliminate steam leaks $17,034 $300 - $17,034
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $10,346 - - $11,146
-
MMBtu
$(-800.0)
04 2.2136: Install / repair insulation on steam lines $13,854 $1,011 - $13,854
-
MMBtu
-
05 2.6212: Turn off equipment during breaks, reduce operating time $16,218 $2,000 - $16,218
-
MMBtu
-
06 2.2514: Cover open tanks $4,463 $300 - $4,463
-
MMBtu
-
07 2.2121: Increase amount of condensate returned $3,149 $3,230 $(-243.0)
(-4,982)
kWh
$3,392
-
MMBtu
-
08 2.2122: Install / repair insulation on condensate lines $1,383 $106 - $1,383
-
MMBtu
-
09 2.6232: Install set-back timers $3,408 - $3,408
69,754
kWh
- -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $258 $60 $258
5,275
kWh
- -
TOTAL RECOMMENDED $225,678 $56,207 $(-14,735.0)
(-301,583)
kWh
$241,213
-
MMBtu
$(-800.0)
TOTAL IMPLEMENTED $221,146 $52,871 $(-14,492.0)
(-296,601)
kWh
$236,438
-
MMBtu
$(-800.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs