Assessment Year | 1984 |
---|---|
Principal Product | LEATHER TANNING |
NAICS |
n/a
|
SIC | 3111: Leather Tanning and Finishing |
Sales Range | $10 M to 50M |
# of Employees | 240 |
Plant Area |
n/a
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $214,835 | 4,395,956 |
kWh
|
$0.049 |
Natural Gas | $869,276 | 163,889 |
MMBtu
|
$5.30 |
LPG | $11,762 | 1,191 |
MMBtu
|
$9.88 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $225,678 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $221,146 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $155,565 | $49,200 |
$(-18,158.0)
(-371,630)
kWh
|
$173,723
-
MMBtu
|
- | |
02 | 2.2135: Repair and eliminate steam leaks | $17,034 | $300 | - |
$17,034
-
MMBtu
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $10,346 | - | - |
$11,146
-
MMBtu
|
$(-800.0) | |
04 | 2.2136: Install / repair insulation on steam lines | $13,854 | $1,011 | - |
$13,854
-
MMBtu
|
- | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $16,218 | $2,000 | - |
$16,218
-
MMBtu
|
- | |
06 | 2.2514: Cover open tanks | $4,463 | $300 | - |
$4,463
-
MMBtu
|
- | |
07 | 2.2121: Increase amount of condensate returned | $3,149 | $3,230 |
$(-243.0)
(-4,982)
kWh
|
$3,392
-
MMBtu
|
- | |
08 | 2.2122: Install / repair insulation on condensate lines | $1,383 | $106 | - |
$1,383
-
MMBtu
|
- | |
09 | 2.6232: Install set-back timers | $3,408 | - |
$3,408
69,754
kWh
|
- | - | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $258 | $60 |
$258
5,275
kWh
|
- | - | |
TOTAL RECOMMENDED | $225,678 | $56,207 |
$(-14,735.0)
(-301,583)
kWh
|
$241,213
-
MMBtu
|
$(-800.0) | ||
TOTAL IMPLEMENTED | $221,146 | $52,871 |
$(-14,492.0)
(-296,601)
kWh
|
$236,438
-
MMBtu
|
$(-800.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs