ITAC Assessment: TN0234
ITAC logo
ITAC Assessment: TN0234
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product MACHINE TOOLS
NAICS
n/a
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $10
M
to 50
M
# of Employees 151
Plant Area
n/a
Annual Production 650
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,650 4,919,988
kWh
Natural Gas $20,834 3,500
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,788 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,524

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $6,646 $30,000 - $6,646
-
MMBtu
02 2.7492: Use proper thickness of insulation on building envelope $7,385 $30,392 $2,338
28,722
kWh
$5,047
-
MMBtu
03 2.6232: Install set-back timers $2,524 - $2,524
62,134
kWh
-
04 2.7422: Plant trees or shrubs near windows to shield from sunlight $233 $408 $233
5,862
kWh
-
TOTAL RECOMMENDED $16,788 $60,800 $5,095
96,718
kWh
$11,693
-
MMBtu
TOTAL IMPLEMENTED $2,524 - $2,524
62,134
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs