ITAC Assessment: NC0207
ITAC logo
ITAC Assessment: NC0207
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Tubeless tire valves
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 110,000
ft2
Annual Production 175,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $277,008 7,783,120
kWh
Electricity Demand $86,943 14,368
kW-mo/yr
Natural Gas $7,012 1,089
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,948 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,525

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $423 $2,700 $198
5,449
kWh
$225
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,148 $750 $862
23,684
kWh
$286
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $16,705 $10,000 $16,705
458,924
kWh
- -
04 2.7241: Install outside air damper / economizer on hvac unit $15,272 $12,600 $15,272
418,867
kWh
- -
05 2.7229: Air condition only space necessary $13,400 $12,400 $8,255
226,800
kWh
$3,645
-
kW-mo/yr
$1,500
TOTAL RECOMMENDED $46,948 $38,450 $41,292
1,133,724
kWh
$4,156
-
kW-mo/yr
$1,500
TOTAL IMPLEMENTED $46,525 $35,750 $41,094
1,128,275
kWh
$3,931
-
kW-mo/yr
$1,500
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs