ITAC Assessment: TN0233
ITAC logo
ITAC Assessment: TN0233
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product WOODEN BEDROOM FURNITURE
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 36,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $534,353 9,851,993
kWh
Natural Gas $3,167 547
MMBtu
Wood $34,223 78,484
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,013 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,192

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $4,090 $3,430 $3,657
67,409
kWh
$433
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $118 $186 - $118
-
MMBtu
03 2.2122: Install / repair insulation on condensate lines $40 $117 - $40
-
MMBtu
04 3.6123: Burn wood by-products for heat $731 $5,000 $763
14,068
kWh
$(-32.0)
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $636 $95 $636
11,723
kWh
-
06 2.6232: Install set-back timers $398 - $398
7,327
kWh
-
TOTAL RECOMMENDED $6,013 $8,828 $5,454
100,527
kWh
$559
-
MMBtu
TOTAL IMPLEMENTED $1,192 $398 $1,034
19,050
kWh
$158
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs