ITAC Assessment: TN0214
ITAC logo
ITAC Assessment: TN0214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product BOTTLED SOFT DRINKS
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 5,000,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,882 1,640,973
kWh
Natural Gas $60,981 12,479
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,089 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $11,671 $29,800 - $11,671
-
MMBtu
02 2.7261: Install timers and/or thermostats $2,705 $1,000 - $2,705
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,407 $2,100 $1,407
23,447
kWh
-
04 2.2511: Insulate bare equipment $480 $627 - $480
-
MMBtu
05 2.6232: Install set-back timers $826 $1,850 $826
13,775
kWh
-
TOTAL RECOMMENDED $17,089 $35,377 $2,233
37,222
kWh
$14,856
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs