ITAC Assessment: TN0205
ITAC logo
ITAC Assessment: TN0205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product ROLLER BEARINGS
NAICS
n/a
SIC 3562: Ball and Roller Bearings
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 1,800,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $334,640 7,876,026
kWh
Natural Gas $342,636 81,862
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,756 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $9,391 $100,000 - $9,391
-
MMBtu
02 2.1123: Install automatic stack damper $1,147 $620 - $1,147
-
MMBtu
03 2.7111: Reduce illumination to minimum necessary levels $2,190 - $2,190
72,978
kWh
-
04 2.7261: Install timers and/or thermostats $624 $210 $624
20,809
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $404 - $404
13,482
kWh
-
TOTAL RECOMMENDED $13,756 $100,830 $3,218
107,269
kWh
$10,538
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs