Assessment Year | 2016 |
---|---|
Principal Product | Molded Urethane |
NAICS | 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing |
SIC | 3086: Plastics Foam Products |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
75,000
ft2
|
Annual Production | 2,100,000
lb
|
Production Hrs. Annual | 6,400
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $225,106 | 3,098,004 |
kWh
|
$0.073 |
Electricity Demand | $29,572 | 4,308 |
kW-mo/yr
|
$6.86 |
Electricity Fees | $255 | - |
|
- |
Natural Gas | $24,811 | 3,547 |
MMBtu
|
$6.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,708 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,902 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $7,751 | - |
$294
4,300
kWh
|
$109
-
kW-mo/yr
|
$7,348
-
MMBtu
|
- | - | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $5,203 | - |
$3,928
57,430
kWh
|
$1,275
-
kW-mo/yr
|
- | - | - | |
03 | 2.2511: Insulate bare equipment | $15,056 | $750 |
$13,131
192,000
kWh
|
$1,925
-
kW-mo/yr
|
- | - | - | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $10,308 | - |
$8,309
121,500
kWh
|
$1,999
-
kW-mo/yr
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $4,195 | $1,683 |
$3,528
51,591
kWh
|
$318
-
kW-mo/yr
|
- | - | $349 | |
06 | 2.2437: Recover waste heat from equipment | $2,717 | $1,500 |
$(-93.0)
(-1,359)
kWh
|
$(-19.0)
-
kW-mo/yr
|
$2,829
-
MMBtu
|
- | - | |
07 | 2.4323: Use optimum size and capacity equipment | $2,236 | $5,400 |
$2,011
29,400
kWh
|
$225
-
kW-mo/yr
|
- | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,111 | $29 |
$977
14,280
kWh
|
$134
-
kW-mo/yr
|
- | - | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $920 | $1,000 |
$1,125
16,450
kWh
|
$155
-
kW-mo/yr
|
- | - | $(-360.0) | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,879 | $3,100 |
$2,511
36,719
kWh
|
$368
-
kW-mo/yr
|
- | - | - | |
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,440 | $2,275 |
$1,256
18,360
kWh
|
$184
-
kW-mo/yr
|
- | - | - | |
12 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,892 | $5,000 |
$(-51.0)
(-746)
kWh
|
$(-295.0)
-
kW-mo/yr
|
- | $(-6,050.0) | $8,288 | |
TOTAL RECOMMENDED | $55,708 | $20,737 |
$36,926
539,925
kWh
|
$6,378
-
kW-mo/yr
|
$10,177
-
MMBtu
|
$(-6,050.0) | $8,277 | ||
TOTAL IMPLEMENTED | $29,902 | $7,529 |
$14,489
211,855
kWh
|
$3,358
-
kW-mo/yr
|
$10,177
-
MMBtu
|
$(-6,050.0) | $7,928 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs