ITAC Assessment: TN0162
ITAC logo
ITAC Assessment: TN0162
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product CARBONATED SOFT DRINKS
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 168
Plant Area
n/a
Annual Production 2,500,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,992 1,091,149
kWh
Natural Gas $32,410 7,810
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,795 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $467 $600 - $467
-
MMBtu
02 2.1123: Install automatic stack damper $623 $1,260 - $623
-
MMBtu
03 2.2437: Recover waste heat from equipment $7,327 $17,020 - $7,327
-
MMBtu
04 2.6232: Install set-back timers $378 - $378
12,603
kWh
-
TOTAL RECOMMENDED $8,795 $18,880 $378
12,603
kWh
$8,417
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs