ITAC Assessment: TN0154
ITAC logo
ITAC Assessment: TN0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product ELECTRONIC COILS
NAICS
n/a
SIC 3677: Electronic Coils, Transformers, and Other Inductors
Sales Range $1
M
to 5
M
# of Employees 71
Plant Area
n/a
Annual Production 1,000,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,796 444,314
kWh
Fuel Oil #2 $7,055 837
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,168 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $844 $25 $844
28,136
kWh
- -
02 2.1332: Convert combustion equipment to burn natural gas $2,418 $3,500 - $(-1,940.0)
-
MMBtu
$4,358
-
MMBtu
03 2.6232: Install set-back timers $642 $2,100 $642
21,395
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $264 - $264
8,792
kWh
- -
TOTAL RECOMMENDED $4,168 $5,625 $1,750
58,323
kWh
$(-1,940.0)
-
MMBtu
$4,358
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs