ITAC Assessment: TN0153
ITAC logo
ITAC Assessment: TN0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product ICE CREAM
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range n/a
# of Employees 56
Plant Area
n/a
Annual Production 3,000
Tgal
Production Hrs. Annual 2,730
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $159,782 3,009,965
kWh
Natural Gas $36,137 9,072
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,864 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $4,321 $690 - $4,321
-
MMBtu
02 2.2437: Recover waste heat from equipment $3,900 $16,750 - $3,900
-
MMBtu
03 2.1131: Repair faulty insulation in furnaces, boilers, etc $1,495 $179 - $1,495
-
MMBtu
04 2.2511: Insulate bare equipment $887 $74 - $887
-
MMBtu
05 2.2163: Use minimum steam operating pressure $766 - - $766
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $281 $2,760 $281
9,379
kWh
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $214 $108 $214
7,034
kWh
-
TOTAL RECOMMENDED $11,864 $20,561 $495
16,413
kWh
$11,369
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs