Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product HYDRAULIC PUMPS, MOTORS
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $5
M
to 10
M
# of Employees 250
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $448,297 11,223,916
kWh
Natural Gas $59,535 17,061
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,916 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $662 $492 $662
13,482
kWh
-
02 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $3,328 - $1,088
22,274
kWh
$2,240
-
MMBtu
03 2.7245: Use direct air supply to exhaust hoods $2,926 $1,563 $1,307
26,671
kWh
$1,619
-
MMBtu
TOTAL RECOMMENDED $6,916 $2,055 $3,057
62,427
kWh
$3,859
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs