ITAC Assessment: TN0113
ITAC logo
ITAC Assessment: TN0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product STAINLESS STEEL PIPES
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range n/a
# of Employees 250
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 0
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,097 3,554,220
kWh
Natural Gas $258,771 71,245
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,850 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $7,117 $5,000 - $7,117
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $36,010 $16,000 - $36,010
-
MMBtu
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,005 - $3,005
-
kWh
-
04 2.3212: Optimize plant power factor $4,718 $2,000 $4,718
-
kWh
-
TOTAL RECOMMENDED $50,850 $23,000 $7,723
-
kWh
$43,127
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs