ITAC Assessment: TA0125
ITAC logo
ITAC Assessment: TA0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Fabricated Rebars
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3449: Miscellaneous Structural Metal Work
Sales Range $10
M
to 50
M
# of Employees 20
Plant Area 40,000
ft2
Annual Production 24,000
ton
Production Hrs. Annual 3,168
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,557 199,950
kWh
Electricity Demand $5,239 789
kW-mo/yr
Natural Gas $1,293 176
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $273,496 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $273,496

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,191 $155 $2,331
34,177
kWh
$860
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $894 - $653
9,567
kWh
$241
-
kW-mo/yr
03 2.7447: Install vinyl strip / high speed / air curtain doors $268,990 - $268,990
3,944,138
kWh
-
04 2.7124: Make a practice of turning off lights when not needed $421 - $77
1,123
kWh
$344
-
kW-mo/yr
TOTAL RECOMMENDED $273,496 $155 $272,051
3,989,005
kWh
$1,445
-
kW-mo/yr
TOTAL IMPLEMENTED $273,496 $155 $272,051
3,989,005
kWh
$1,445
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs