ITAC Assessment: TA0106
ITAC logo
ITAC Assessment: TA0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Aircraft parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 100,000
ft2
Annual Production 230,000
pieces
Production Hrs. Annual 7,296
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $427,394 6,554,068
kWh
Electricity Demand $93,304 13,709
kW-mo/yr
Electricity Fees $23,717 -
Natural Gas $39,834 4,601
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,399 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,999

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.8121: Apply for tax-free status for energy purchases $28,674 $(-14,337.0) - - $28,674
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,775 $175 $4,200
67,055
kWh
$575
-
kW-mo/yr
-
03 2.4222: Install adequate dryers on air lines to eliminate blowdown $4,400 $185 $4,400
70,166
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $25,400 $12,395 $22,340
356,336
kWh
$3,060
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $1,150 $100 $1,150
18,385
kWh
- -
TOTAL RECOMMENDED $64,399 $(-1,482.0) $32,090
511,942
kWh
$3,635
-
kW-mo/yr
$28,674
TOTAL IMPLEMENTED $59,999 $(-1,667.0) $27,690
441,776
kWh
$3,635
-
kW-mo/yr
$28,674
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs