Assessment Year | 2004 |
---|---|
Principal Product | Concrete Products |
NAICS | 327332: Concrete Pipe Manufacturing |
SIC | 3273: Ready-Mixed Concrete |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
1
ft2
|
Annual Production | 280,000,000
lb
|
Production Hrs. Annual | 2,376
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $270,847 | 5,748,924 |
kWh
|
$0.047 |
Electricity Demand | $57,232 | 13,409 |
kW-mo/yr
|
$4.27 |
Electricity Fees | $(-18,731.0) | - |
|
- |
Natural Gas | $393,840 | 67,507 |
MMBtu
|
$5.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $96,826 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $96,826 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4235: Remove or close off unneeded compressed air lines | $67,776 | $13,000 |
$67,776
1,139,951
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,160 | $585 |
$14,726
247,675
kWh
|
$1,434
-
kW-mo/yr
|
- | |
03 | 2.2135: Repair and eliminate steam leaks | $7,900 | $875 | - | - |
$7,900
-
MMBtu
|
|
04 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $3,990 | $1,600 |
$3,690
62,082
kWh
|
$300
-
kW-mo/yr
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $1,000 | $1,000 | - | - |
$1,000
-
MMBtu
|
|
TOTAL RECOMMENDED | $96,826 | $17,060 |
$86,192
1,449,708
kWh
|
$1,734
-
kW-mo/yr
|
$8,900
-
MMBtu
|
||
TOTAL IMPLEMENTED | $96,826 | $17,060 |
$86,192
1,449,708
kWh
|
$1,734
-
kW-mo/yr
|
$8,900
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs