ITAC Assessment: HO0189
ITAC logo
ITAC Assessment: HO0189
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Chemicals
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 97,000
ft2
Annual Production 3,200,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,182 1,782,825
kWh
Electricity Demand $36,153 4,796
kW-mo/yr
Electricity Fees $(-13,435.0) -
Natural Gas $127,375 28,593
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,196 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,465

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,434 $10,179 $4,566
59,789
kWh
$868
-
kW-mo/yr
- - - -
02 2.2414: Use waste heat from hot flue gases to preheat $8,097 $5,180 - - $8,097
-
MMBtu
- - -
03 2.2136: Install / repair insulation on steam lines $6,631 $10,500 - - $6,631
-
MMBtu
- - -
04 4.652: Replace existing equipment with more suitable substitutes $14,000 $20,000 - - - - $14,000 -
05 4.611: Begin a practice of predictive / preventative maintenance $9,400 $500 - - - - - $9,400
06 3.4151: Minimize water usage $2,000 $2,000 - - - $2,000
-
Tgal
- -
07 3.4114: Replace city water with recycled water via cooling tower $8,634 $5,000 $(-1,366.0)
(-17,878)
kWh
- - $10,000
-
Tgal
- -
TOTAL RECOMMENDED $54,196 $53,359 $3,200
41,911
kWh
$868
-
kW-mo/yr
$14,728
-
MMBtu
$12,000
-
Tgal
$14,000 $9,400
TOTAL IMPLEMENTED $23,465 $23,179 $4,566
59,789
kWh
$868
-
kW-mo/yr
$6,631
-
MMBtu
$2,000
-
Tgal
- $9,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs