ITAC Assessment: TA0078
ITAC logo
ITAC Assessment: TA0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Oil Well Service Pumps
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area
n/a
Annual Production 300
pieces
Production Hrs. Annual 3,980
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $198,854 3,174,366
kWh
Electricity Demand $74,408 21,788
kW-mo/yr
Electricity Fees $5,807 -
Natural Gas $53,626 6,645
MMBtu
Other Energy $31,000 17,700
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $197,600 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $197,600

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Energy Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $158,700 $100,000 $18,800
326,700
kWh
$170,900
-
kW-mo/yr
- - $(-31,000.0)
-
MMBtu
02 2.6231: Utilize controls to operate equipment only when needed $9,000 $988 - - - $9,000
-
MMBtu
-
03 2.2522: Isolate hot or cold equipment $600 $140 - - - $600
-
MMBtu
-
04 2.7224: Reduce space conditioning during non-working hours $11,300 $1,014 $11,300
196,000
kWh
- - - -
05 2.8121: Apply for tax-free status for energy purchases $18,000 $(-4,506.0) - - $18,000 - -
TOTAL RECOMMENDED $197,600 $97,636 $30,100
522,700
kWh
$170,900
-
kW-mo/yr
$18,000 $9,600
-
MMBtu
$(-31,000.0)
-
MMBtu
TOTAL IMPLEMENTED $197,600 $97,636 $30,100
522,700
kWh
$170,900
-
kW-mo/yr
$18,000 $9,600
-
MMBtu
$(-31,000.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs