Assessment Year | 2004 |
---|---|
Principal Product | Oil Well Service Pumps |
NAICS | 333132: Oil and Gas Field Machinery and Equipment Manufacturing |
SIC | 3533: Oil and Gas Field Machinery and Equipment |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 300
pieces
|
Production Hrs. Annual | 3,980
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $198,854 | 3,174,366 |
kWh
|
$0.063 |
Electricity Demand | $74,408 | 21,788 |
kW-mo/yr
|
$3.42 |
Electricity Fees | $5,807 | - |
|
- |
Natural Gas | $53,626 | 6,645 |
MMBtu
|
$8.07 |
Other Energy | $31,000 | 17,700 |
MMBtu
|
$1.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $197,600 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $197,600 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Energy Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $158,700 | $100,000 |
$18,800
326,700
kWh
|
$170,900
-
kW-mo/yr
|
- | - |
$(-31,000.0)
-
MMBtu
|
|
02 | 2.6231: Utilize controls to operate equipment only when needed | $9,000 | $988 | - | - | - |
$9,000
-
MMBtu
|
- | |
03 | 2.2522: Isolate hot or cold equipment | $600 | $140 | - | - | - |
$600
-
MMBtu
|
- | |
04 | 2.7224: Reduce space conditioning during non-working hours | $11,300 | $1,014 |
$11,300
196,000
kWh
|
- | - | - | - | |
05 | 2.8121: Apply for tax-free status for energy purchases | $18,000 | $(-4,506.0) | - | - | $18,000 | - | - | |
TOTAL RECOMMENDED | $197,600 | $97,636 |
$30,100
522,700
kWh
|
$170,900
-
kW-mo/yr
|
$18,000 |
$9,600
-
MMBtu
|
$(-31,000.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $197,600 | $97,636 |
$30,100
522,700
kWh
|
$170,900
-
kW-mo/yr
|
$18,000 |
$9,600
-
MMBtu
|
$(-31,000.0)
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs