| Assessment Year | 2003 |
|---|---|
| Principal Product | Refigeration Components and Chemicals |
| NAICS | 325199: All Other Basic Organic Chemical Manufacturing |
| SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 60 |
| Plant Area |
180,000
ft2
|
| Annual Production | 600,000
pieces
|
| Production Hrs. Annual | 3,258
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $123,410 | 2,928,707 |
kWh
|
$0.042 |
| Electricity Demand | $41,412 | 9,039 |
kW-mo/yr
|
$4.58 |
| Natural Gas | $63,057 | 8,037 |
MMBtu
|
$7.85 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,654 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $23,250 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7291: Reschedule and rearrange multiple-source heating systems | $15,460 | - | - | - |
$15,460
-
MMBtu
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,000 | $400 |
$2,180
53,000
kWh
|
$820
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7229: Air condition only space necessary | $2,500 | $100 |
$2,500
60,500
kWh
|
- | - | - | - | |
| 04 | 3.5316: Contract a wood pallet recycling company | $1,800 | - | - | - | - |
$1,800
-
Tgal
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $335 | - |
$245
5,950
kWh
|
$90
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.7135: Install occupancy sensors | $190 | $123 |
$190
4,635
kWh
|
- | - | - | - | |
| 07 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $155 | - | - | - | - | - |
$155
-
gal
|
|
| 08 | 2.4221: Install compressor air intakes in coolest locations | $214 | $120 |
$90
2,173
kWh
|
$124
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $23,654 | $743 |
$5,205
126,258
kWh
|
$1,034
-
kW-mo/yr
|
$15,460
-
MMBtu
|
$1,800
-
Tgal
|
$155
-
gal
|
||
| TOTAL IMPLEMENTED | $23,250 | $500 |
$4,925
119,450
kWh
|
$910
-
kW-mo/yr
|
$15,460
-
MMBtu
|
$1,800
-
Tgal
|
$155
-
gal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs