ITAC Assessment: TA0058
ITAC logo
ITAC Assessment: TA0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Refigeration Components and Chemicals
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 180,000
ft2
Annual Production 600,000
pieces
Production Hrs. Annual 3,258
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,410 2,928,707
kWh
Electricity Demand $41,412 9,039
kW-mo/yr
Natural Gas $63,057 8,037
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,654 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,250

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings
01 2.7291: Reschedule and rearrange multiple-source heating systems $15,460 - - - $15,460
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,000 $400 $2,180
53,000
kWh
$820
-
kW-mo/yr
- - -
03 2.7229: Air condition only space necessary $2,500 $100 $2,500
60,500
kWh
- - - -
04 3.5316: Contract a wood pallet recycling company $1,800 - - - - $1,800
-
Tgal
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $335 - $245
5,950
kWh
$90
-
kW-mo/yr
- - -
06 2.7135: Install occupancy sensors $190 $123 $190
4,635
kWh
- - - -
07 3.5248: Separate and recycle scrap metal to foundry or for sale $155 - - - - - $155
-
gal
08 2.4221: Install compressor air intakes in coolest locations $214 $120 $90
2,173
kWh
$124
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $23,654 $743 $5,205
126,258
kWh
$1,034
-
kW-mo/yr
$15,460
-
MMBtu
$1,800
-
Tgal
$155
-
gal
TOTAL IMPLEMENTED $23,250 $500 $4,925
119,450
kWh
$910
-
kW-mo/yr
$15,460
-
MMBtu
$1,800
-
Tgal
$155
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs