ITAC Assessment: TA0055
ITAC logo
ITAC Assessment: TA0055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Wood Office Furniture
NAICS 337211: Wood Office Furniture Manufacturing
SIC 2521: Wood Office Furniture
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 330,000
ft2
Annual Production 14,000
pieces
Production Hrs. Annual 4,214
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $371,062 6,736,226
kWh
Electricity Demand $65,196 15,441
kW-mo/yr
Electricity Fees $63,318 -
Natural Gas $47,627 12,069
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $144,720 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $138,635

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.8114: Change rate schedules or other changes in utility service $68,000 - - - $68,000 - -
02 2.7447: Install vinyl strip / high speed / air curtain doors $36,000 $31,820 $36,000
729,000
kWh
- - - -
03 2.7221: Lower temperature during the winter season and vice-versa $14,100 $46 $14,100
285,755
kWh
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,400 $910 $7,570
153,400
kWh
$1,830
-
kW-mo/yr
- - -
05 3.5316: Contract a wood pallet recycling company $9,360 - - - - - $9,360
-
lb
06 2.7233: Use properly designed and sized hvac equipment $5,260 $2,000 $4,730
95,760
kWh
$530
-
kW-mo/yr
- - -
07 2.7313: Recycle air for heating, ventilation and air conditioning $1,675 $1,000 $665
13,468
kWh
- - $1,010
-
MMBtu
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $535 $985 $480
9,810
kWh
$55
-
kW-mo/yr
- - -
09 3.5313: Increase amount of waste recovered for resale $290 - - - - - $290
-
lb
10 2.2514: Cover open tanks $100 - - - - $100
-
MMBtu
-
TOTAL RECOMMENDED $144,720 $36,761 $63,545
1,287,193
kWh
$2,415
-
kW-mo/yr
$68,000 $1,110
-
MMBtu
$9,650
-
lb
TOTAL IMPLEMENTED $138,635 $33,776 $58,335
1,181,623
kWh
$1,830
-
kW-mo/yr
$68,000 $1,110
-
MMBtu
$9,360
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs