ITAC Assessment: TA0035
ITAC logo
ITAC Assessment: TA0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Activation Carbon
NAICS
n/a
SIC 2898:
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 8,700,000
ft2
Annual Production 90,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $311,726 9,832,800
kWh
Electricity Demand $130,222 25,685
kW-mo/yr
Electricity Fees $(-4,547.0) -
Natural Gas $583,892 129,426
MMBtu
Fuel Oil #1 $39,989 30,761
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $367,509 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $362,373

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Administrative Changes Savings Water Consumption Savings
01 2.2135: Repair and eliminate steam leaks $306,746 $5,202 $306,746
9,380,615
kWh
- - - -
02 2.7124: Make a practice of turning off lights when not needed $26,355 - $10,069
307,914
kWh
$16,286
-
kW-mo/yr
- - -
03 3.4115: Recover and reuse cooling water $14,779 $6,925 - - - - $14,779
-
Tgal
04 2.7124: Make a practice of turning off lights when not needed $9,139 - $5,377
164,427
kWh
$3,762
-
kW-mo/yr
- - -
05 2.4314: Use synthetic lubricant $4,592 - - - $4,592
-
MMBtu
- -
06 2.6231: Utilize controls to operate equipment only when needed $3,855 $778 $3,855
117,878
kWh
- - - -
07 2.2135: Repair and eliminate steam leaks $720 $2,145 - - - - $720
-
Tgal
08 3.5311: Recover and reuse waste material $762 - - - - $762 -
09 3.2176: Increase use of automation $561 $87 $561
17,148
kWh
- - - -
TOTAL RECOMMENDED $367,509 $15,137 $326,608
9,987,982
kWh
$20,048
-
kW-mo/yr
$4,592
-
MMBtu
$762 $15,499
-
Tgal
TOTAL IMPLEMENTED $362,373 $12,127 $322,192
9,852,956
kWh
$20,048
-
kW-mo/yr
$4,592
-
MMBtu
$762 $14,779
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs