| Assessment Year | 2002 |
|---|---|
| Principal Product | Iron and Steel plug valves |
| NAICS |
n/a
|
| SIC | 3494: Valves and Pipe Fittings, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 211 |
| Plant Area |
307,000
ft2
|
| Annual Production | 60,000
pieces
|
| Production Hrs. Annual | 6,312
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $543,826 | 12,951,975 |
kWh
|
$0.042 |
| Electricity Demand | $249,692 | 30,138 |
kW-mo/yr
|
$8.28 |
| Electricity Fees | $9,717 | - |
|
- |
| Natural Gas | $9,216 | 9,856 |
MMBtu
|
$0.94 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,763 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,988 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4224: Upgrade controls on compressors | $5,615 | $400 |
$4,190
121,400
kWh
|
$1,425
-
kW-mo/yr
|
- | |
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $5,600 | $550 |
$3,400
98,467
kWh
|
$2,200
-
kW-mo/yr
|
- | |
| 03 | 3.7115: Clean lines with "pigs" instead of solvents / solutions | $4,915 | $750 | - | - |
$4,915
-
Tgal
|
|
| 04 | 2.2511: Insulate bare equipment | $2,680 | $635 |
$2,680
77,700
kWh
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,290 | $440 |
$2,290
66,390
kWh
|
- | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,070 | $700 |
$1,070
31,082
kWh
|
- | - | |
| 07 | 2.4314: Use synthetic lubricant | $858 | - |
$410
11,877
kWh
|
$448
-
kW-mo/yr
|
- | |
| 08 | 2.7122: Disconnect ballasts | $660 | $675 |
$400
11,655
kWh
|
$260
-
kW-mo/yr
|
- | |
| 09 | 2.7135: Install occupancy sensors | $560 | $150 |
$560
16,285
kWh
|
- | - | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $315 | $640 |
$220
6,377
kWh
|
$95
-
kW-mo/yr
|
- | |
| 11 | 2.6212: Turn off equipment during breaks, reduce operating time | $200 | - |
$200
5,780
kWh
|
- | - | |
| TOTAL RECOMMENDED | $24,763 | $4,940 |
$15,420
447,013
kWh
|
$4,428
-
kW-mo/yr
|
$4,915
-
Tgal
|
||
| TOTAL IMPLEMENTED | $18,988 | $3,515 |
$14,820
429,578
kWh
|
$4,168
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs