ITAC Assessment: TA0015
ITAC logo
ITAC Assessment: TA0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Direct Mailings
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 63
Plant Area 55,000
ft2
Annual Production 3,340,000
lb
Production Hrs. Annual 6,288
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,870 2,410,140
kWh
Electricity Demand $56,502 6,955
kW-mo/yr
Electricity Fees $14,492 -
Natural Gas $20,538 2,891
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,123 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,300 $300 $1,300
35,995
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $963 - $963
13,008
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $942 - $942
12,200
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $918 $840 - $918
-
MMBtu
TOTAL RECOMMENDED $4,123 $1,140 $3,205
61,203
kWh
$918
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs