Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Polyethylene pipes and fittings
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 118,000
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 8,520
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $476,892 16,605,360
kWh
Electricity Demand $186,762 34,609
kW-mo/yr
Electricity Fees $63,378 -
Natural Gas $6,694 811
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,250 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,560

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4314: Use synthetic lubricant $9,690 - $6,390
177,077
kWh
$3,300
-
kW-mo/yr
02 2.6231: Utilize controls to operate equipment only when needed $4,880 $70 $4,880
135,288
kWh
-
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,300 $2,190 $2,300
63,966
kWh
-
04 2.7135: Install occupancy sensors $1,590 $130 $1,590
44,085
kWh
-
05 2.2511: Insulate bare equipment $1,130 $110 $1,130
31,360
kWh
-
06 2.2511: Insulate bare equipment $660 $85 $660
18,230
kWh
-
TOTAL RECOMMENDED $20,250 $2,585 $16,950
470,006
kWh
$3,300
-
kW-mo/yr
TOTAL IMPLEMENTED $10,560 $2,585 $10,560
292,929
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs