Assessment Year | 2001 |
---|---|
Principal Product | Polyethylene pipes and fittings |
NAICS |
n/a
|
SIC | 3084: Plastics Pipe |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
118,000
ft2
|
Annual Production | 60,000,000
lb
|
Production Hrs. Annual | 8,520
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $476,892 | 16,605,360 |
kWh
|
$0.029 |
Electricity Demand | $186,762 | 34,609 |
kW-mo/yr
|
$5.40 |
Electricity Fees | $63,378 | - |
|
- |
Natural Gas | $6,694 | 811 |
MMBtu
|
$8.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,250 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,560 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4314: Use synthetic lubricant | $9,690 | - |
$6,390
177,077
kWh
|
$3,300
-
kW-mo/yr
|
|
02 | 2.6231: Utilize controls to operate equipment only when needed | $4,880 | $70 |
$4,880
135,288
kWh
|
- | |
03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $2,300 | $2,190 |
$2,300
63,966
kWh
|
- | |
04 | 2.7135: Install occupancy sensors | $1,590 | $130 |
$1,590
44,085
kWh
|
- | |
05 | 2.2511: Insulate bare equipment | $1,130 | $110 |
$1,130
31,360
kWh
|
- | |
06 | 2.2511: Insulate bare equipment | $660 | $85 |
$660
18,230
kWh
|
- | |
TOTAL RECOMMENDED | $20,250 | $2,585 |
$16,950
470,006
kWh
|
$3,300
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $10,560 | $2,585 |
$10,560
292,929
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs