Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Industrial Paperboard Products
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 61
Plant Area 80,000
ft2
Annual Production 1,000
ton
Production Hrs. Annual 4,500
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,701 1,168,016
kWh
Electricity Demand $21,425 2,708
kW-mo/yr
Electricity Fees $2,462 -
Natural Gas $25,496 3,625
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,755 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,404

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $5,587 $585 $3,937
111,720
kWh
- $1,650
-
MMBtu
02 2.4226: Use / purchase optimum sized compressor $4,350 - $4,350
123,434
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,597 $480 $1,597
45,320
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $364 - $364
3,600
kWh
- -
05 2.6218: Turn off equipment when not in use $233 - $233
6,608
kWh
- -
06 2.3137: Use power during off-peak periods $210 - - $210
-
kW-mo/yr
-
07 2.4314: Use synthetic lubricant $158 - $71
2,019
kWh
$87
-
kW-mo/yr
-
08 2.7135: Install occupancy sensors $146 $160 $146
4,158
kWh
- -
09 2.2136: Install / repair insulation on steam lines $110 $106 - - $110
-
MMBtu
TOTAL RECOMMENDED $12,755 $1,331 $10,698
296,859
kWh
$297
-
kW-mo/yr
$1,760
-
MMBtu
TOTAL IMPLEMENTED $2,404 $480 $2,194
55,528
kWh
$210
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs