Assessment Year | 2001 |
---|---|
Principal Product | Prefabricated Homes |
NAICS |
n/a
|
SIC | 2452: Prefabricated Wood Buildings and Components |
Sales Range | $50 M to 100M |
# of Employees | 236 |
Plant Area |
102,000
ft2
|
Annual Production | 2,490
pieces
|
Production Hrs. Annual | 2,117
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $59,020 | 1,129,857 |
kWh
|
$0.052 |
Electricity Demand | $41,857 | 5,296 |
kW-mo/yr
|
$7.90 |
Electricity Fees | $3,767 | - |
|
- |
Natural Gas | $15,795 | 13,775 |
MMBtu
|
$1.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $129,244 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $125,299 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.652: Replace existing equipment with more suitable substitutes | $91,307 | $1,161 |
$(-1,017.0)
(-30,456)
kWh
|
- | $92,324 | - | |
02 | 3.5311: Recover and reuse waste material | $27,800 | $35 | - |
$27,800
-
Tgal
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,501 | $919 |
$4,501
134,713
kWh
|
- | - | - | |
04 | 4.446: Automate finishing process | $3,432 | $5,220 | n/a | - | - | $3,432 | - |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,267 | $1,357 |
$1,267
37,928
kWh
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $513 | $284 |
$513
12,994
kWh
|
- | - | - | |
07 | 4.821: Pay bills on time to avoid late fees | $424 | - | - | - | - | $424 | |
TOTAL RECOMMENDED | $129,244 | $8,976 |
$5,264
155,179
kWh
|
$27,800
-
Tgal
|
$95,756 | $424 | ||
TOTAL IMPLEMENTED | $125,299 | $3,472 |
$4,751
142,185
kWh
|
$27,800
-
Tgal
|
$92,324 | $424 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs