ITAC Assessment: AS0230
ITAC logo
ITAC Assessment: AS0230
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Metal Shop
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 40,000
ft2
Annual Production 33
ton
Production Hrs. Annual 6,300
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,280 1,098,183
kWh
Electricity Demand $8,750 3,176
kW-mo/yr
Electricity Fees $4,215 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $163,002 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $885 $60 $814
14,947
kWh
$71
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $385 $675 $294
5,275
kWh
$91
-
kW-mo/yr
- - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,253 $2,300 $1,253
22,860
kWh
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $171 $261 $152
2,931
kWh
$19
-
kW-mo/yr
- - - -
05 2.7224: Reduce space conditioning during non-working hours $505 $675 $505
9,379
kWh
- - - - -
06 3.6192: Use a less expensive method of waste removal $936 $60 - - $936
-
lb
- - -
07 2.8114: Change rate schedules or other changes in utility service $603 $30 - - - - $603 -
08 4.111: Add equipment/ operators to reduce production bottleneck $158,264 $128,600 $(-9,281.0)
(-170,281)
kWh
$(-2,555.0)
-
kW-mo/yr
- $(-157,500.0) - $327,600
TOTAL RECOMMENDED $163,002 $132,661 $(-6,263.0)
(-114,889)
kWh
$(-2,374.0)
-
kW-mo/yr
$936
-
lb
$(-157,500.0) $603 $327,600
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs