ITAC Assessment: SU0601
ITAC logo
ITAC Assessment: SU0601
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Machine Gun Link Manufacturing
NAICS 332994: Small Arms, Ordnance, and Ordnance Accessories Manufacturing
SIC 3489: Ordnance and Accessories, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 35,000
ft2
Annual Production 48,000,000
pieces
Production Hrs. Annual 4,934
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,950 1,765,440
kWh
Electricity Demand $22,673 4,627
kW-mo/yr
Electricity Fees $2,068 -
Natural Gas $44,022 6,101
MMBtu
TOTAL YEARLY COSTS $182,713
RECOMMENDED SAVINGS* $115,710 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $13,662 - - - - $13,662
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,134 - - $1,134
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,043 - $2,043
31,433
kWh
- - -
04 2.2136: Install / repair insulation on steam lines $2,290 $514 - - $2,290
-
MMBtu
-
05 2.7224: Reduce space conditioning during non-working hours $881 $270 - - $881
-
MMBtu
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $907 $293 $907
13,948
kWh
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,161 $3,789 $10,995
169,150
kWh
$166
-
kW-mo/yr
- -
08 2.7144: Install spectral reflectors / delamp $909 $472 $753
11,587
kWh
$156
-
kW-mo/yr
- -
09 2.4221: Install compressor air intakes in coolest locations $458 $468 $458
7,049
kWh
- - -
10 2.4322: Use or replace with energy efficient substitutes $263 $394 $120
1,839
kWh
$12
-
kW-mo/yr
- $131
11 2.4322: Use or replace with energy efficient substitutes $80,799 $126,593 $(-17,727.8)
(-272,736)
kWh
$(-2,227.3)
-
kW-mo/yr
$28,754
-
MMBtu
$72,000
12 2.7135: Install occupancy sensors $1,202 $7,062 $1,202
18,492
kWh
- - -
TOTAL RECOMMENDED $115,710 $139,854 $(-1,250.5)
(-19,239)
kWh
$(-759.3)
-
kW-mo/yr
$31,926
-
MMBtu
$85,794
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs