ITAC Assessment: GT0413
ITAC logo
ITAC Assessment: GT0413
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product ATHLETIC SOCKS
NAICS
n/a
SIC 2252: Hosiery, Not Elsewhere Classified
Sales Range n/a
# of Employees 60
Plant Area
n/a
Annual Production 9,000,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,712 422,626
kWh
Natural Gas $37,880 6,709
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,470 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,400

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $621 $122 $621
7,034
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $650 $450 - $650
-
MMBtu
03 2.4133: Use most efficient type of electric motors $129 $703 $129
1,465
kWh
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $15,190 $73,850 $20,685
231,829
kWh
$(-5,495.0)
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $2,170 $1,120 - $2,170
-
MMBtu
06 2.2511: Insulate bare equipment $710 $850 - $710
-
MMBtu
TOTAL RECOMMENDED $19,470 $77,095 $21,435
240,328
kWh
$(-1,965.0)
-
MMBtu
TOTAL IMPLEMENTED $1,400 $1,275 $750
8,499
kWh
$650
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs