ITAC Assessment: OD0119
ITAC logo
ITAC Assessment: OD0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Wooden Cable Reels
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 47
Plant Area 40,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,015
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,903 305,686
kWh
Electricity Demand $5,758 1,572
kW-mo/yr
Electricity Fees $5,085 -
Natural Gas $5,526 695
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,417 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,417

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,088 $6,156 $1,669
21,395
kWh
$419
-
kW-mo/yr
02 2.4133: Use most efficient type of electric motors $2,251 $8,135 $1,794
22,860
kWh
$457
-
kW-mo/yr
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $281 $490 $224
2,931
kWh
$57
-
kW-mo/yr
04 2.7135: Install occupancy sensors $126 $100 $126
1,758
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,153 $400 $1,153
14,654
kWh
-
06 2.4224: Upgrade controls on compressors $1,518 $100 $1,518
19,343
kWh
-
TOTAL RECOMMENDED $7,417 $15,381 $6,484
82,941
kWh
$933
-
kW-mo/yr
TOTAL IMPLEMENTED $7,417 $15,381 $6,484
82,941
kWh
$933
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs