ITAC Assessment: UD0875
ITAC logo
ITAC Assessment: UD0875
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Insulated vinyl windows and patio doors
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 309
Plant Area 279,600
ft2
Annual Production 455,177
units
Production Hrs. Annual 7,488
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $294,118 5,242,800
kWh
Electricity Demand $208,852 12,381
kW-mo/yr
Electricity Fees $1,146 -
Natural Gas $36,508 3,693
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,618 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,013

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,925 $4,300 $8,006
143,087
kWh
$1,919
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,208 $1,000 $4,257
61,700
kWh
$551
-
kW-mo/yr
- $(-600.0)
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,013 - $2,704
48,320
kWh
$1,309
-
kW-mo/yr
- -
04 2.2311: Heat treat parts only to required specifications or standards $10,323 - $6,955
124,301
kWh
$3,368
-
kW-mo/yr
- -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,804 $5,000 $13,364
238,857
kWh
$6,324
-
kW-mo/yr
$(-9,884.0)
-
MMBtu
-
06 2.2511: Insulate bare equipment $4,345 $1,205 $3,127
52,560
kWh
$1,218
-
kW-mo/yr
- -
TOTAL RECOMMENDED $42,618 $11,505 $38,413
668,825
kWh
$14,689
-
kW-mo/yr
$(-9,884.0)
-
MMBtu
$(-600.0)
TOTAL IMPLEMENTED $4,013 - $2,704
48,320
kWh
$1,309
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs