Assessment Year | 2009 |
---|---|
Principal Product | Tumbler Cups |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
65,000
ft2
|
Annual Production | 2,000,000
pieces
|
Production Hrs. Annual | 4,335
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $92,468 | 1,309,368 |
kWh
|
$0.071 |
Electricity Demand | $30,617 | 4,560 |
kW-mo/yr
|
$6.71 |
Electricity Fees | $31,451 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,277 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,199 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $18,254 | $3,320 |
$15,105
147
kWh
|
$3,149
-
kW-mo/yr
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,818 | $15,466 |
$10,788
141,949
kWh
|
$3,030
-
kW-mo/yr
|
|
03 | 2.7496: Install partitions to reduce size of conditioned space | $7,691 | $13,320 |
$6,003
78,990
kWh
|
$1,688
-
kW-mo/yr
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,725 | $40 |
$3,785
29,797
kWh
|
$2,940
-
kW-mo/yr
|
|
05 | 2.7221: Lower temperature during the winter season and vice-versa | $3,127 | $2,000 |
$2,477
32,595
kWh
|
$650
-
kW-mo/yr
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,662 | $1,210 |
$1,339
17,618
kWh
|
$323
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $51,277 | $35,356 |
$39,497
301,096
kWh
|
$11,780
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $35,199 | $20,786 |
$28,370
174,691
kWh
|
$6,829
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs