ITAC Assessment: UD0388
ITAC logo
ITAC Assessment: UD0388
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product STEEL AND WOODEN DOORS
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area
n/a
Annual Production 20,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,094 800,410
kWh
Natural Gas $25,090 5,759
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,770 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,682

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2522: Isolate hot or cold equipment $7,341 - $1,041
10,844
kWh
$6,300
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,088 $3,000 $3,852
48,066
kWh
$(-764.0)
-
MMBtu
03 2.7224: Reduce space conditioning during non-working hours $2,341 $800 - $2,341
-
MMBtu
TOTAL RECOMMENDED $12,770 $3,800 $4,893
58,910
kWh
$7,877
-
MMBtu
TOTAL IMPLEMENTED $9,682 $800 $1,041
10,844
kWh
$8,641
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs