| Assessment Year | 2025 |
|---|---|
| Principal Product | Aerospace & Defense Componets |
| NAICS | 332710: Machine Shops |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 64 |
| Plant Area |
55,000
ft2
|
| Annual Production | 112,500
pieces
|
| Production Hrs. Annual | 2,550
hrs
|
| Location (State) | Vermont |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $55,893 | 519,878 |
kWh
|
$0.11 | |
| Electricity Demand | $45,604 | 3,171 |
kW-mo/yr
|
$14.38 | |
| Electricity Fees | $12,940 | - |
|
- | |
| Natural Gas | $9,769 | 915 |
MMBtu
|
$10.68 | |
| Other Gas | $2,500 | 1 |
MMBtu
|
$2,499.76 | |
| Waste Disposal Costs | |||||
| Water Usage | $854 | 120 |
Tgal
|
$7.13 | |
| Water Disposal | $1,054 | 1 |
Tgal
|
$1,054.36 | |
| TOTAL YEARLY COSTS | $128,613 | ||||
| RECOMMENDED SAVINGS* | $90,475 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,279 | - | - |
$2,279
-
kW-mo/yr
|
- | - | |
| 02 | 2.7224: Reduce space conditioning during non-working hours | $775 | - | - | - |
$775
-
MMBtu
|
- | |
| 03 | 2.4322: Use or replace with energy efficient substitutes | $914 | $74 |
$648
6,000
kWh
|
$539
-
kW-mo/yr
|
$(-273.3)
-
MMBtu
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,258 | $209 |
$1,258
11,651
kWh
|
- | - | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $559 | $471 |
$559
5,177
kWh
|
- | - | - | |
| 06 | 2.4322: Use or replace with energy efficient substitutes | $422 | $461 |
$227
2,103
kWh
|
$41
-
kW-mo/yr
|
- | $153 | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,289 | $1,441 |
$665
6,161
kWh
|
$418
-
kW-mo/yr
|
- | $206 | |
| 08 | 2.6211: Conserve energy by efficient use of vending machines | $232 | $368 |
$232
2,146
kWh
|
- | - | - | |
| 09 | 2.7135: Install occupancy sensors | $1,049 | $2,285 |
$1,049
9,710
kWh
|
- | - | - | |
| 10 | 4.651: Install back-up equipment | $30,784 | $86,000 | - | - | - | $30,784 | |
| 11 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $377 | $1,928 |
$377
3,495
kWh
|
- | - | - | |
| 12 | 2.9114: Use solar heat to make electricty | $50,535 | $467,049 |
$50,535
467,920
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $90,475 | $560,285 |
$55,551
514,364
kWh
|
$3,278
-
kW-mo/yr
|
$502
-
MMBtu
|
$31,144 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs