ITAC Assessment: SU0588
ITAC logo
ITAC Assessment: SU0588
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Aerospace & Defense Componets
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 64
Plant Area 55,000
ft2
Annual Production 112,500
pieces
Production Hrs. Annual 2,550
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,893 519,878
kWh
Electricity Demand $45,604 3,171
kW-mo/yr
Electricity Fees $12,940 -
Natural Gas $9,769 915
MMBtu
Other Gas $2,500 1
MMBtu
Waste Disposal Costs
Water Usage $854 120
Tgal
Water Disposal $1,054 1
Tgal
TOTAL YEARLY COSTS $128,613
RECOMMENDED SAVINGS* $90,475 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,279 - - $2,279
-
kW-mo/yr
- -
02 2.7224: Reduce space conditioning during non-working hours $775 - - - $775
-
MMBtu
-
03 2.4322: Use or replace with energy efficient substitutes $914 $74 $648
6,000
kWh
$539
-
kW-mo/yr
$(-273.3)
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,258 $209 $1,258
11,651
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $559 $471 $559
5,177
kWh
- - -
06 2.4322: Use or replace with energy efficient substitutes $422 $461 $227
2,103
kWh
$41
-
kW-mo/yr
- $153
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,289 $1,441 $665
6,161
kWh
$418
-
kW-mo/yr
- $206
08 2.6211: Conserve energy by efficient use of vending machines $232 $368 $232
2,146
kWh
- - -
09 2.7135: Install occupancy sensors $1,049 $2,285 $1,049
9,710
kWh
- - -
10 4.651: Install back-up equipment $30,784 $86,000 - - - $30,784
11 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $377 $1,928 $377
3,495
kWh
- - -
12 2.9114: Use solar heat to make electricty $50,535 $467,049 $50,535
467,920
kWh
- - -
TOTAL RECOMMENDED $90,475 $560,285 $55,551
514,364
kWh
$3,278
-
kW-mo/yr
$502
-
MMBtu
$31,144
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs