ITAC Assessment: SU0562
ITAC logo
ITAC Assessment: SU0562
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Electronic Circuit Boards
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 32,000
ft2
Annual Production 400,000
units
Production Hrs. Annual 2,080
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,097 643,400
kWh
Electricity Demand $41,797 3,150
kW-mo/yr
Electricity Fees $4,219 -
Natural Gas $5,001 584
MMBtu
Other Gas $506 1
MMBtu
Waste Disposal Costs
Water Usage $1,200 216
Tgal
TOTAL YEARLY COSTS $105,819
RECOMMENDED SAVINGS* $144,966 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7122: Disconnect ballasts $526 - $273
3,295
kWh
$252
-
kW-mo/yr
- - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,090 - - $2,090
-
kW-mo/yr
- - -
03 2.4239: Eliminate or reduce compressed air usage $656 - $656
7,898
kWh
- - - -
04 2.8121: Apply for tax-free status for energy purchases $3,064 $120 - - - - $3,064
05 2.2437: Recover waste heat from equipment $374 $418 - - $374
-
MMBtu
- -
06 4.651: Install back-up equipment $75,000 $86,000 - - - $75,000 -
07 2.4221: Install compressor air intakes in coolest locations $419 $632 $419
5,052
kWh
- - - -
08 4.631: Install an uninteruptable power supply $25,000 $80,000 - - - - $25,000
09 2.2511: Insulate bare equipment $639 $2,272 $986
11,876
kWh
- $(-346.8)
-
MMBtu
- -
10 2.9114: Use solar heat to make electricty $291 $1,234 $291
3,504
kWh
- - - -
11 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $437 $2,900 $437
5,265
kWh
- - - -
12 2.9114: Use solar heat to make electricty $36,470 $266,289 $36,470
439,398
kWh
- - - -
TOTAL RECOMMENDED $144,966 $439,865 $39,532
476,288
kWh
$2,342
-
kW-mo/yr
$28
-
MMBtu
$75,000 $28,064
TOTAL IMPLEMENTED - - - - - - -