ITAC Assessment: UA0093
ITAC logo
ITAC Assessment: UA0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Fabricated Metal Products
NAICS 332313: Plate Work Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 208
Plant Area 125,000
ft2
Annual Production 19,756
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,096 2,670,648
kWh
Electricity Demand $28,391 9,024
kW-mo/yr
Electricity Fees $13,542 -
LPG $44,482 2,518
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,346 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,226

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings One-time Revenue or Avoided Cost Savings
01 2.2437: Recover waste heat from equipment $8,477 $15,565 $8,019
128,158
kWh
- $458 - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,498 $2,500 $2,840
45,390
kWh
$469
-
kW-mo/yr
$189 - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,514 $1,600 $3,816
60,987
kWh
$454
-
kW-mo/yr
$244 - -
04 2.6218: Turn off equipment when not in use $3,728 - - - - $3,728
-
MMBtu
-
05 2.1331: Burn a less expensive grade of fuel $30,129 $6,665 - - - - $30,129
TOTAL RECOMMENDED $50,346 $26,330 $14,675
234,535
kWh
$923
-
kW-mo/yr
$891 $3,728
-
MMBtu
$30,129
TOTAL IMPLEMENTED $7,226 $2,500 $2,840
45,390
kWh
$469
-
kW-mo/yr
$189 $3,728
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs