Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Processed cheese
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $100
M
to 500
M
# of Employees 120
Plant Area 40,000
ft2
Annual Production 80,000,000
lb
Production Hrs. Annual 8,520
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $574,090 10,735,600
kWh
Electricity Demand $30,327 11,987
kW-mo/yr
Natural Gas $1,215,644 192,978
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $536,781 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $443,040

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,769 $3,632 $1,567
27,832
kWh
$202
-
kW-mo/yr
- -
02 2.1213: Direct warmest air to combustion intake $18,219 $1,000 - - $18,219
-
MMBtu
-
03 2.2136: Install / repair insulation on steam lines $1,961 $321 - - $1,961
-
MMBtu
-
04 2.2192: Use heat exchange fluids instead of steam in pipeline tracing systems $71,792 $33,000 - - $71,792
-
MMBtu
-
05 4.441: Install automatic packing equipment $443,040 $453,047 - - - $443,040
TOTAL RECOMMENDED $536,781 $491,000 $1,567
27,832
kWh
$202
-
kW-mo/yr
$91,972
-
MMBtu
$443,040
TOTAL IMPLEMENTED $443,040 $453,047 - - - $443,040
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs