ITAC Assessment: SU0545
ITAC logo
ITAC Assessment: SU0545
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Contract Metal Fabricator
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area 135,000
ft2
Annual Production 2,600,000
units
Production Hrs. Annual 6,400
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,521 1,961,131
kWh
Electricity Demand $76,975 7,086
kW-mo/yr
Natural Gas $62,547 12,801
MMBtu
Waste Disposal Costs
Water Usage $3,537 332,000
Tgal
Solid Waste (non-haz) $29,215 100,000
lb
TOTAL YEARLY COSTS $365,795
RECOMMENDED SAVINGS* $61,592 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $669

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $9,727 $45 - - - $9,727
02 2.8121: Apply for tax-free status for energy purchases $1,784 $45 - - - $1,784
03 2.7122: Disconnect ballasts $104 - $81
815
kWh
$23
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $576 - $576
5,818
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $159 - $159
1,606
kWh
- - -
06 2.4322: Use or replace with energy efficient substitutes $1,870 $113 $1,337
13,500
kWh
$815
-
kW-mo/yr
$(-281.3)
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $669 $83 $163
1,642
kWh
$25
-
kW-mo/yr
- $482
08 2.4221: Install compressor air intakes in coolest locations $1,364 $413 $1,364
13,775
kWh
- - -
09 2.9114: Use solar heat to make electricty $27,713 $29,395 $27,713
279,930
kWh
- - -
10 2.6211: Conserve energy by efficient use of vending machines $924 $1,011 $924
9,330
kWh
- - -
11 2.8227: Adjust / maintain fork lift trucks for most efficient operation $16,546 $21,000 $(-6,063.8)
(-61,250)
kWh
- - $22,610
12 2.7135: Install occupancy sensors $111 $185 $111
1,121
kWh
- - -
13 2.2437: Recover waste heat from equipment $46 $198 - - $46
-
MMBtu
-
TOTAL RECOMMENDED $61,592 $52,487 $26,363
266,288
kWh
$862
-
kW-mo/yr
$(-235.4)
-
MMBtu
$34,602
TOTAL IMPLEMENTED $669 $83 $163
1,642
kWh
$25
-
kW-mo/yr
- $482
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs