Assessment Year | 2023 |
---|---|
Principal Product | Surgical equipment including electrodes and probes |
NAICS | 334510: Electromedical and Electrotherapeutic Apparatus Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $100 M to 500M |
# of Employees | 350 |
Plant Area |
521,200
ft2
|
Annual Production | 1,100,000
units
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $616,315 | 14,157,462 |
kWh
|
$0.044 |
Electricity Demand | $163,449 | 26,644 |
kW-mo/yr
|
$6.13 |
Electricity Fees | $82,416 | - |
|
- |
Natural Gas | $275,642 | 71,244 |
MMBtu
|
$3.87 |
TOTAL YEARLY COSTS | $1,137,822 | |||
RECOMMENDED SAVINGS* | $22,983 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $393 | - | - | - |
$393
-
MMBtu
|
- | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,173 | - | - |
$8,173
-
kW-mo/yr
|
- | - | |
03 | 4.821: Pay bills on time to avoid late fees | $1,766 | - | - | - | - | $1,766 | |
04 | 2.7122: Disconnect ballasts | $8,707 | - |
$7,117
161,741
kWh
|
$1,590
-
kW-mo/yr
|
- | - | |
05 | 2.4322: Use or replace with energy efficient substitutes | $79 | $6 |
$53
1,200
kWh
|
$46
-
kW-mo/yr
|
$(-19.9)
-
MMBtu
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $2,768 | $1,080 |
$2,768
62,907
kWh
|
- | - | - | |
07 | 2.2136: Install / repair insulation on steam lines | $1,097 | $2,011 | - | - |
$1,097
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $22,983 | $3,097 |
$9,937
225,848
kWh
|
$9,809
-
kW-mo/yr
|
$1,470
-
MMBtu
|
$1,766 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs