ITAC Assessment: SU0533
ITAC logo
ITAC Assessment: SU0533
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Surgical equipment including electrodes and probes
NAICS 334510: Electromedical and Electrotherapeutic Apparatus Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 521,200
ft2
Annual Production 1,100,000
units
Production Hrs. Annual 7,488
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $616,315 14,157,462
kWh
Electricity Demand $163,449 26,644
kW-mo/yr
Electricity Fees $82,416 -
Natural Gas $275,642 71,244
MMBtu
TOTAL YEARLY COSTS $1,137,822
RECOMMENDED SAVINGS* $22,983 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2437: Recover waste heat from equipment $393 - - - $393
-
MMBtu
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,173 - - $8,173
-
kW-mo/yr
- -
03 4.821: Pay bills on time to avoid late fees $1,766 - - - - $1,766
04 2.7122: Disconnect ballasts $8,707 - $7,117
161,741
kWh
$1,590
-
kW-mo/yr
- -
05 2.4322: Use or replace with energy efficient substitutes $79 $6 $53
1,200
kWh
$46
-
kW-mo/yr
$(-19.9)
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $2,768 $1,080 $2,768
62,907
kWh
- - -
07 2.2136: Install / repair insulation on steam lines $1,097 $2,011 - - $1,097
-
MMBtu
-
TOTAL RECOMMENDED $22,983 $3,097 $9,937
225,848
kWh
$9,809
-
kW-mo/yr
$1,470
-
MMBtu
$1,766
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs