ITAC Assessment: SU0524
ITAC logo
ITAC Assessment: SU0524
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Cable, Wire Harness, Precision Machining
NAICS 332721: Precision Turned Product Manufacturing
SIC 3451: Screw Machine Products
Sales Range $1
M
to 5
M
# of Employees 31
Plant Area 50,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 4,810
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,294 680,640
kWh
Electricity Demand $28,437 2,152
kW-mo/yr
Electricity Fees $8,819 -
Natural Gas $11,277 1,694
MMBtu
Waste Disposal Costs
Water Usage $1,000 150
Tgal
TOTAL YEARLY COSTS $103,827
RECOMMENDED SAVINGS* $18,471 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $1,266 - $1,266
15,828
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $12,837 $2,064 $8,943
111,784
kWh
$3,685
-
kW-mo/yr
- $209
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,106 $875 $2,106
26,329
kWh
- - -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,422 $650 - $1,422
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $525 $462 $525
6,567
kWh
- - -
06 2.7314: Reduce ventilation air $314 $510 $114
1,422
kWh
- $200
-
MMBtu
-
TOTAL RECOMMENDED $18,471 $4,561 $12,954
161,930
kWh
$5,107
-
kW-mo/yr
$200
-
MMBtu
$209
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs