ITAC Assessment: SU0511
ITAC logo
ITAC Assessment: SU0511
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Dielectric Powder
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 135
Plant Area 380,000
ft2
Annual Production 40,000,000
lb
Production Hrs. Annual 4,186
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $616,608 17,562,074
kWh
Electricity Demand $114,816 14,481
kW-mo/yr
Natural Gas $208,607 56,281
MMBtu
TOTAL YEARLY COSTS $940,031
RECOMMENDED SAVINGS* $16,040 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,715

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $9,835 $882 $9,463
270,351
kWh
- $372
-
MMBtu
02 2.4322: Use or replace with energy efficient substitutes $1,055 $140 $538
15,360
kWh
$760
-
kW-mo/yr
$(-243.0)
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $3,490 $589 - - $3,490
-
MMBtu
04 2.7135: Install occupancy sensors $1,660 $4,595 $1,660
47,424
kWh
- -
TOTAL RECOMMENDED $16,040 $6,206 $11,660
333,135
kWh
$760
-
kW-mo/yr
$3,619
-
MMBtu
TOTAL IMPLEMENTED $2,715 $4,735 $2,197
62,784
kWh
$760
-
kW-mo/yr
$(-243.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs